Göktaş I-II Hydroelectric Plants

ADANA

 

275.6MW

Installed Capacity

1,117.66GWh

Annual Energy Generation

Göktaş 1-2 Hydroelectric Power Plants are located on the Zamanti tributary of Seyhan River in Kozan and Aladağ districts  of the province of Adana. Their installed capacity is 275.6 MW  and the average annual power generation is 1.12 billion kWh.  Göktaş 2 has been commissioned in 2015 and Göktaş 1 has been commissioned in 2016.

 


Mentaş Hydroelectric Plants

ADANA

 

49.6MW

Installed Capacity

178.73GWh

Annual Energy Generation

Mentaş Hydroelectric Power Plant is located on the Seyhan  River in İmamoğlu district of the province of Adana. Its  installed capacity is 49.6 MW and the average annual  energy generation is 179 million kWh. The power plant  has been commissioned in 2006.

 


Toros Hydroelectric Plants

ADANA

 

49.99MW

Installed Capacity

208.57 GWh

Annual Energy Generation

Toros Hydroelectric Power Plant is located on the Çakıt River within the borders of the province of Adana. It has an installed capacity of 49.99 MW and an average annual energy generation of 208.6 million kWh. The power plant has been commissioned in 2013.


Feslek Hydroelectric Plants

AYDIN

 

8.84MW

Installed Capacity

41.28GWh

Annual Energy Generation

It is located on the Büyük Menderes River within the borders of Nazilli District of the province of Aydın. It has a total installed capacity of 8.84 MW and has an average annual energy generation of 41.3 million kWh. The plant has been commissioned in 2004.

 


Kemer Hydroelectric Plants

AYDIN

 

48MW

Installed Capacity

62GWh

Annual Energy Generation

It is located on the Akçay Creek in the Bozdoğan district of the province of Aydın. Publicly-owned Kemer Hydroelectric Power Plant, operated by Elektrik Üretim A.Ş. (EÜAŞ), has been incorporated into Aydem Renewable Energy at the beginning of 2017 through privatization. It has a total installed capacity of 48 MW and an average annual energy generation of 62 million kWh.


Adıgüzel Hydroelectric Plants

DENİZLİ

 

62MW

Installed Capacity

280GWh

Annual Energy Generation

Adıgüzel Hydroelectric Power Plant is located on the Büyük Menderes River in the district of Güney of the province of Denizli. Its installed capacity is 62 MW and the average annual energy generation is 280 million kWh. The power plant has been commissioned in 1996 and has been incorporated into the  Aydem Renewable Energy in 2017.

 


Bereket Hydroelectric Plants I-II

DENİZLİ

 

3.15MW

Installed Capacity

12GWh

Annual Energy Generation

Bereket 1 and 2 Hydroelectric Power Plants, which are the first power plants established by the private-sector in Turkey outside the State, are located on Bereket Irrigation Canal which is fed by Çürüksu, the distributary of the Büyük Menderes River and stands 5 km distance to the center of Denizli. The plants have a total installed power of 3.15 MW and an annual average energy generation of 12 million kWh. The plants have been commissioned in 1997.


Aksu Hydroelectric Plants

DÜZCE

 

46.2MW

Installed Capacity

141.37GWh

Annual Energy Generation

It is established on Aksu Creek within the borders of the province of Düzce. It has a total installed capacity of 46.2 MW and an average annual power generation of 141.4 million kWh. The power plant has been commissioned in 2014.


Çırakdamı Hydroelectric Plants

GİRESUN

 

49.1MW

Installed Capacity

140GWh

Annual Energy Generation

Çırakdamı Hydroelectric Power Plant is located on the Aksu River in Dereli district of the province of Giresun. It has an installed capacity of 49.1 MW and an average annual power generation of 140 million kWh. The power plant has been commissioned in 2012.


Dereli Hydroelectric Plants

GİRESUN

 

62MW

Installed Capacity

157.50GWh

Annual Energy Generation

Dereli Hydroelectric Power Plant is located on the Aksu River in Dereli district of the province of Giresun. It has an installed capacity of 49.2 MW and an average annual power generation of 157.5 million kWh. The power plant has been commissioned in 2014.


Akköprü Hydroelectric Plants

MUĞLA

 

115MW

Installed Capacity

343GWh

Annual Energy Generation

Akköprü Hydroelectric Power Plants are established on Creek within the borders of the province of Muğla. The total installed capacity of the plants is 115 MW and the average annual power generation is 343 million kWh.


Dalaman I-V Hydroelectric Plants

MUĞLA

 

37.5MW

Installed Capacity

179.08GWh

Annual Energy Generation

Dalaman 1-5 Hydroelectric Power Plants are established on Dalaman Creek within the borders of the province of Muğla. They consist of 5 power plants, each with equal power. The total installed capacity of the plants is 37.5 MW and the average annual power generation is 179.1 million kWh. The plants have been commissioned between the years of 1999 and 2005.


Gökyar Hydroelectric Plants

MUĞLA

 

10.95MW

Installed Capacity

43.35GWh

Annual Energy Generation

Gökyar Hydroelectric Power Plant is built on Dalaman Creek which rises from Denizli and Burdur provinces and flows into the sea within the boundaries of the province of Muğla. It has a total installed capacity of 11 MW and an average annual generation of 43.4 million kWh.


Koyulhisar Hydroelectric Plants

SİVAS

 

63MW

Installed Capacity

337.34GWh

Annual Energy Generation

Koyulhisar Hydroelectric Power Plant is located on the Kelkit River in Koyulhisar district of the province of Sivas. It has an installed capacity of 63 MW and an annual energy generation of 337.3 million kWh on average. The plant has been operational since 2009.


Akıncı Hydroelectric Plants

TOKAT

 

99MW

Installed Capacity

448.24GWh

Annual Energy Generation

Akıncı Hydroelectric Power Plant is located on the Kelkit River which runs through the district boundaries of Reşadiye and Niksar in the province of Tokat. Its installed capacity is 99 MW and the average annual energy generation is 448.2 million kWh. The power plant has been commissioned in 2018.